When required by the Director, the user of any property served by a building sewer carrying potentially harmful or industrial wastes must install a suitable compliance sampling point in the building sewer to facilitate observation, measurement, and sampling of the wastes.

A. Such compliance sampling point, when required, must be accessible and safely located and must be constructed in accordance with plans approved by the Director.

B. The compliance sampling point must be installed by the user at its expense and must be maintained by the user so as to be safe and accessible at all times.

C. Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and sampled must be promptly removed by the user at the request of the Director and must not be replaced. The costs of clearing such access will be borne by the user.

D. The Director may require the user to install monitoring equipment as necessary. The facility’s sampling and monitoring equipment must be maintained at all times in a safe and proper operating condition by the user. Any device used to measure wastewater flow and quality must be calibrated at the frequency and maintained in accordance with the device manufacturer’s recommendations to ensure its accuracy. (Ord. No. G-6740, § 1, 2020)