Sec. 30-11. Applicability of fees.
This chapter shall apply to all development connecting with the water system of the City of Phoenix in accordance with the following table:
Fee Required |
Fee Not Required |
|||
---|---|---|---|---|
ADDITIONS TO BUILDINGS |
||||
(1) |
Additions to a lot which already has building improvements and a water meter connection, according to the following schedule: |
|||
(A) |
Additions attached to an existing building where the addition has no water meter included in the new work, and the addition does not use City water. |
X |
||
(B) |
Additions attached to an existing building, which additions include a water meter or which require the installation of an original water meter or a new water meter with increased capacity. |
X |
||
(C) |
Additions or modifications to an existing building that result in additional dwelling units. |
X |
||
UNATTACHED NEW BUILDINGS |
||||
(2) |
A new building which has a new water meter and is not attached to an existing building. |
X |
||
REMODELING |
||||
(3) |
Interior remodeling, such as adding a bathroom, clothes washer, lavatory, water closet, etc.: |
|||
(A) |
If existing water meter can be used and no additional dwelling units will result. |
X |
||
(B) |
If existing 5/8" meter is exchanged for a new 3/4" meter in a commercial building. |
X |
||
(C) |
If existing 5/8" meter is exchanged for a new 3/4" or 1" meter in a single-family dwelling. |
X |
||
(D) |
If water meter is increased in size above 3/4" for a commercial development. |
X |
||
(E) |
If water meter is increased above 1" for a residential development. |
X |
||
(F) |
If existing water meter can be used but additional apartments or dwelling units will result. |
X |
||
(G) |
If additional water meters are acquired for landscape irrigation. |
X |
||
MOBILE HOMES |
||||
(4) |
Mobile homes: |
|||
(A) |
Installation of a mobile home in a zoned "mobile home development" (on-site permit) where title to all of the lots remains in one ownership. (Such fees are collected at the time a permit is issued for "mobile home development" site development work.) |
X |
||
(B) |
Installation of a mobile home (on-site permit) on a lot other than a zoned "mobile home development." |
X |
||
BUILDINGS WHICH ARE MOVED |
||||
(5) |
A building moved onto a lot: |
|||
(A) |
Which requires a new water meter. |
X |
||
(B) |
Which has an existing building water meter, but the building served by the meter is removed. (One building is substituted for another building.) |
X |
||
(C) |
Same as (B) above, except that the present use of the water meter will continue. (Add another building and leave existing building.) |
X |
||
(D) |
Both building and meter moved. |
X |
||
(E) |
Which results in additional dwelling units served by the same meter. |
X |
||
SWIMMING POOLS |
||||
(6) |
Water meter for a swimming pool. |
X |
(Ord. No. G-5985, 2015)