A. Final reports. Upon completion of the work, the Planning and Development Director may require the following reports:

1. Certification by the supervising engineer that all grading, lot drainage, and drainage facilities have been completed in conformance with the approved plans, the City of Phoenix Stormwater Policies and Standards Manual and this chapter.

2. A geotechnical report including certifications of soil bearing capacity of compacted fills, summaries of field and laboratory tests and locations of tests.

3. An engineering geology report based on the final construction. It shall include specific approval of the grading as affected by geological factors. Where necessary, a revised geologic map and cross sections, and any recommendations regarding building restrictions or foundation setbacks, shall be included.

B. Notification of completion. The permittee or his agent shall notify the Planning and Development Director when the grading operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage structures and their protective devices, have been completed and required reports have been submitted. (Ord. No. G-1177, § 1; Ord. No. G-1192, § 1; Ord. No. G-1203, § 3; Ord. No. G-3313, § 1; Ord. No. G-5590, § 1, 2011; Ord. No. G-5707, 2012)