Skip to main content
Loading…
This section is included in your selections.

A. The Department will assess water service connection charges as follows:

Tap and Meter With Trench Paving Repairs

Fee

Meter Sizes

Cost per Meter

5/8"

$3,041.00

3/4"

3,066.00

1"

3,550.00

1 1/2"

4,005.00

2"

4,152.00

3"*

8,555.00

4"*

9,551.00

6"*

12,269.00

6" fire rated*

12,643.00

8" fire rated*

13,138.00

Tap and Meter Without Trench Paving Repairs

Fee

Meter Sizes

Cost per Meter

5/8"

$1,753.00

3/4"

1,779.00

1"

2,263.00

1 1/2"

2,806.00

2"

2,953.00

3"*

7,526.00

4"*

8,522.00

6"*

11,240.00

6" fire rated*

11,614.00

8" fire rated*

12,720.00

*3", 4", 6" and 8" sizes must be constructed at cost with trust deposit in the amount shown. The concrete vault required for 3", 4", 6" and 8" sizes is the responsibility of the developer.

B. Special provisions. The Department will charge the "Tap and Meter with Trench Paving Repairs" fee if the tap and meter are located within a paved street as designated by the City’s street classification map. The developer must also comply with all requirements and pay all fees and costs prescribed in Section 31-49.1. In areas outside of the City, the Department will charge the appropriate fee, and the developer must coordinate the work and any additional fees with the governing jurisdiction. (Ord. No. G-6741, § 2 (Exh. A), 2020)