A. Tap only (includes corp stop, service lines, curb stop, meter box and lid). The Department will assess tap installation charges as follows:

With Trench Paving Repairs

Meter Sizes

Cost per Meter

5/8"

$2,734.00

3/4"

2,734.00

1"

3,180.00

1 1/2"

3,527.00

2"

3,653.00

3"*

5,485.00

4"*

6,003.00

6"*

7,213.00

*3", 4" and 6" sizes to be constructed at cost with trust deposit in the amount shown. The concrete vault required for 3", 4" and 6" sizes is the responsibility of the developer.

Without Trench Paving Repairs

Meter Sizes

Cost per Meter

5/8"

$1,442.00

3/4"

1,442.00

1"

1,893.00

1 1/2"

2,322.00

2"

2,454.00

3"*

4,457.00

4"*

4,974.00

6"*

6,184.00

*3", 4" and 6" sizes to be constructed at cost with trust deposit in the amount shown. The concrete vault required for 3", 4" and 6" sizes is the responsibility of the developer.

B. Meter only. The Department will assess meter installation charges as follows:

Meter Sizes

Cost per Meter

5/8"

$680.00

3/4"

700.00

1"

794.00

1 1/2"

1,051.00

2"

1,203.00

3"*

3,625.00

4"*

4,527.00

6"*

5,331.00

*3", 4" and 6" sizes to be constructed at cost, with trust deposit in the amount shown.

C. Special provisions. The Department will charge the "Tap and Meter with Trench Paving Repairs" fee if the tap and meter are located within a paved street as designated by the City’s street classification map. The developer must also comply with all requirements and pay all fees and costs prescribed in Section 31-49.1. In areas outside of the City, the Department will charge the appropriate fee, and the developer must coordinate the work and any additional fees with the governing jurisdiction. (Ord. No. G-6741, § 2 (Exh. A), 2020)