Sec. 4-36. Practice landings and takeoffs.
This section is included in your selections.
All touch-and-go landing practice shall be done with permission of the control tower (when in operation), and in accordance with the guidelines adopted by the Aviation Director. (Ord. No. G-4116, § 2, 1998)